Coachbuilding & fabrication

When the part doesn’t exist any more, we make it.

This is the core of the trade. A quarter panel last produced in 1974. A complex wing. A suspension mount.

MaterialsSteel, aluminium, copper, brass, stainless
FormingMetal shaping and planishing, rolling, folding
JoiningMIG welding, brazing, gas welding, precision fabricated assemblies
ReproductionOriginal panels remade from the part or from a buck
CompositeGRP laminating, bespoke parts
Hand-made GRP arch flare on the bench
A bespoke arch flare, hand-finished, in front of the chassis it belongs to.

Steel, not fibreglass.

An arch extension or a reinforcement made in shaped steel becomes part of the shell — it carries load. In fibreglass it just sits on top of it.

The difference doesn’t show in photographs. It shows in use.

We laminate too when that is the right call — a non-structural flare, a cosmetic part. It is a question of what the part does, not dogma.

Heat shrinking: heat a precise spot, the steel draws back, and the panel returns to shape. No filler at this stage — there is nothing to fill.

Trade customers

We also work for other workshops and restorers in the region. If you are a trade customer without a metal shaper, let’s talk.

Get in touch
Call WhatsApp